We’re in beta. Here’s what you can expect, and how to make your app as available as it can be.
During the beta
We aim for the dashboard to be up 99.5% of each month. That’s a target, not a promise.
The status page, once it’s live, will show how the dashboard, builds and deploys, and the region are doing. See Support.
When your app can be down
- A single instance: if the part of our infrastructure it runs on fails, or needs maintenance, your process is down until it starts again elsewhere.
- A process with a volume always has exactly one instance, and its volume lives in one place. If that fails, it comes back from the latest backup, and data written since is lost. Planned maintenance moves it with a final backup, so nothing’s lost, but it’s down while that runs. See Volumes and backups.
- Deploys of a process with a volume stop it, then start it: a few seconds of downtime each time.
- A sleeping app takes a few seconds longer to answer its first request.
Run more than one instance
Where you can, run two or more instances of each process:
- Open your app’s Processes page.
- Set Instances to 2 or more.
- Choose Save.
Instances of the same process are spread across our infrastructure where there’s room, so one failure is less likely to stop them all. Traffic goes only to healthy instances, and deploys replace them one at a time, so visitors see no errors.
Each instance is billed, so two instances cost twice as much. See Billing.
Keeping data safe
A process with a volume can’t run more than one instance. To protect what’s on it:
- keep your own database dumps somewhere else, as well as our daily backups;
- keep code and configuration in your image and variables, not on the volume, so any instance can start from scratch.
When the region is full
If there’s no room in the region to start an instance, the action fails with “The region is at capacity. Try again later.” Nothing is billed, and what’s running isn’t touched.
We’ll tell you
We email you when:
- a deploy fails, or a process keeps crashing;
- we restore a volume after an infrastructure failure, with the time of the backup it came from;
- we plan to move a volume for maintenance, and once it’s done.